A clause for alarm

Dawn Kawamoto and John Borland ZDNet US

Published: 17 Jul 2002 08:50 BST

  • Email
  • Trackback
  • Clip Link
  • Print friendly
  • Post Comment

You and your supplier should agree on how to define terms used in the contract. Here is a sample of definitions taken from Oracle's contract with the state of California.

Preventive Maintenance -- That maintenance, performed on a scheduled basis by the Contractor, which is designed to keep the equipment in proper operating condition.

Remedial Maintenance -- That maintenance performed by the Contractor, which results from equipment (including operating software) failure, and which is performed as required; i.e., on an unscheduled basis.

Principal Period of Maintenance -- Any nine consecutive hours per day (usually between the hours of 7:00 a.m. and 6:00 p.m.) as selected by the State, including an official meal period not to exceed one hour, Monday through Friday, excluding holidays observed at the installation.

Maintenance Diagnostic Routines -- The diagnostic programs customarily used by the Contractor to test equipment for proper functioning and reliability.

Facility Readiness Date -- The date specified in the contract by which the State must have the site prepared and available for equipment delivery and installation.

Installation Date -- The date specified in the contract by which the Contractor must have the ordered equipment ready (certified) for use by the State.

Performance Period -- A period of time during which the State, by appropriate tests and production runs, evaluates the performance of newly installed equipment and software prior to its acceptance by the State.

Acceptance Tests -- Those tests performed during the Performance Period as listed in the purchase order which are intended to determine compliance of equipment and software with Contractor's published specifications and to determine the reliability of the equipment.

Machine Alteration -- Any change to a Contractor-supplied machine which is not made by the Contractor, and which results in the machine deviating from its physical, mechanical, electrical, or electronic (including microcode) design, whether or not additional devices or parts are employed in making such change.


Have your say instantly in the Tech Update forum.

Find out what's where in the new Tech Update with our Guided Tour.

Let the editors know what you think in the Mailroom.

Next

Previous

1 2 3 4


  • Email
  • Trackback
  • Clip Link
  • Print friendlyPrint with EPSON

Did you find this article useful?
201 out of 337 people found this useful


Full Talkback thread

0 comments

Company/Topic Alerts

Create a new alert from the list below:






Video icon

Video

Microsoft Futures

Windows 7: Mixed reviews from PDC attendees

As developers received their copies of Windows 7 on Tuesday, they offered varied reactions to the Microsoft operating system update More

Microsoft floats clouds on Windows Azure

At the Professional Developers Conference, Microsoft announced the Azure Services Platform, the company's cloud-computing platform More

Ozzie: Success of Azure comes down to trust

In an interview, Ray Ozzie says businesses will be taking a risk by placing core operations in Microsoft's datacentre, but that the software giant has more to lose if things go bad More


Skip Sub Navigation Links to CNET Brand Links

Help

Become part of the ZDNet community.

Newsletters